About us

A woodworking technology company manufacturing innovative windows, doors, and glazed facade systems.

Our products meet the highest energy efficiency standards while delivering refined design value – frameless solutions, carefully selected materials, and unique technology that redefines what’s possible in modern window manufacturing.

From complex frameless window assemblies and designer entrance doors to glazed roofs for restaurants and iconic architectural visions – this is our expertise and our passion.

i2 Factory was founded in 2009 and has grown into a strong team of engineers, designers, and craftsmen.

We are not only technologically innovative — we also think green. Two-thirds of the energy used in our production and logistics is self-generated. We are the first window manufacturer in Latvia to receive the EPD certificate and rank No.1 on Sweden’s Green Building recommendations list.

Krists Slokenbergs
Founder of i2 Factory

We are proud of more than 10 award-winning buildings in Latvia and Sweden, recognized not only for their energy efficiency but also for architectural excellence. Thank you to all our partners!

Manufacturing

Partnerships

Energy-Efficient Modernization of Production Equipment

The company I2 SIA is implementing the project “Energy-Efficient Modernization of Production Equipment” with a total budget of EUR 180,527.83, of which EU funding amounts to EUR 44,758.96. The project is being implemented within the framework of the European Union Recovery and Resilience Facility plan, reform and investment direction 1.2 “Improvement of Energy Efficiency”, under investment 1.2.1.2.i “Improving Energy Efficiency in Business (including the transition to the use of renewable energy technologies in heat supply and research and development activities, including in the bioeconomy)”, measure 1.2.1.2.i.1 “Improving Energy Efficiency in Business (including the transition to the use of renewable energy technologies in heat supply)”, administered by ALTUM, in accordance with Agreement No. 214915/02.

The project предусматриes the replacement of existing inefficient production equipment with new equipment — a wood chip extraction system with briquetting unit SPANEX SMU 100 – SHB 60 and a four-sided planer with cutter head set WEINIG Profimat 50.

The project will be implemented from April 2026 to October 2026, and its objective is to improve the energy efficiency of the production processes of I2 SIA, reduce energy consumption, and promote more efficient and sustainable manufacturing operations.

Development of Construction Systems

SIA I2, in collaboration with SIA “Forest Sector Competence Centre”, is implementing a research project titled “Development and study of a construction system for sustainable residential buildings with high energy efficiency”. The research is being carried out within the framework of the European Union Recovery and Resilience Facility investment project “Forest Sector Competence Centre” No. 1.2.1.2.i.2/1/24/A/CFLA/001.

Purchase of a new zero-emission electric vehicle Citroën Ë-Berlingo VAN Electric for company needs

I2 SIA purchased a zero-emission electric vehicle – Citroën Ë-Berlingo VAN Electric – for €33,050 with a capital discount of €7,609.66, under the European Union Recovery and Resilience Facility’s reform and investment direction 1.2 “Improving energy efficiency”, administered by the Development Finance Institution ALTUM within the program “Electric Vehicle Purchase Guarantee with Capital Discount”.

The project was implemented from May to October 2024. The target is to drive at least 20,000 km with the purchased EV within 12 months, contributing to greenhouse gas emissions reduction.

Website and digital solutions platform development

The EU Recovery Fund programme “Support for the digitalisation of processes in business” approved the application submitted by I2 SIA under contract No. 9.2-17-L-2025/261 for the development of a website and digital solutions platform. This support was necessary to digitise the creation of a new company website with an e-commerce solution.

Purchase of a wood chip-pellet boiler

The project is implemented within the framework of the European Union Recovery and Resilience Mechanism Plan administered by ALTUM, within the framework of the 1.2. reform and investment direction “Improvement of energy efficiency” 1.2.1.2.i. investment “Increasing energy efficiency in business (including the transition to the use of renewable energy technologies in heat supply and research and development activities (including bioeconomy))” 1.2.1.2.i.1. measure “Increasing energy efficiency in business (including the transition to the use of renewable energy technologies in heat supply)” concluded under contract No. 214915/01.